• HOME
  • O'LEARY GALLERY
  • REFERENCES
  • COMMUNICATIONS & PRESS
  • WORK BY CATEGORY
  • ABOUT ME
  • More
    • HOME
    • O'LEARY GALLERY
    • REFERENCES
    • COMMUNICATIONS & PRESS
    • WORK BY CATEGORY
    • ABOUT ME
  • Sign In

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • HOME
  • O'LEARY GALLERY
  • REFERENCES
  • COMMUNICATIONS & PRESS
  • WORK BY CATEGORY
  • ABOUT ME

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

RETAIL

1/7

CREDO BEAUTY / 99 NORTH 6TH STREET

ABOUT THE PROJECT


  • Beauty store in the heart of Williamsburg, Brooklyn.
  • Major structural re-enforcements done to stabilize building and lower entire existing structural slab to meet ADA requirements with new entrance to meet existing sidewalk. This included full structural MOP for shoring of the entire building, removal and install of new structural steel throughout as well as demoing existing slab and pouring new slab.
  • Once structural renovations were completed and based on the great work completed, the new tenant hired us to complete their full store build out.

01/15

CAMP

ABOUT THE PROJECT


Project Value: $2 Million

Project Role: Project Lead  


  • Amazing new interactive toy store on 5th Avenue which open prior to Christmas 2018.
  • Lead a team to build out this 10,000 sq. ft. store in 5 weeks. Original schedule was 8 weeks but due to permit delays due to landmarks, we were left with a 5 week schedule to complete so the store could open before Christmas.


CAMP Store Opens in Flatiron With Cool New Indoor Play Zone _ MommyPoppins - Things to do in New York City with Kids (pdf)Download
Milk Bar Opens Union Square Location Saturday in Camp - Eater NY (pdf)Download
New store blends retail and entertainment - Story _ WNYW (pdf)Download
This Amazing New Toy Store Is Your Kid_s Next Obsession (OK, Yours Too) (pdf)Download

1/5

NORMAL

ABOUT THE PROJECT


  • Store Buildout in Manhattan for custom headphones company.


3D printed headphone brand Normal opens flagship and factory in Chelsea  - NY Daily News (pdf)Download

01/25

3DEN LOUNGE

ABOUT THE PROJECT


Project Value: $2.5 Million

Project Role: Project Lead - Project Executive


  • TCO Project built at 20 Hudson Yards, due to open in March 15th 2019.


PRESS

  • https://techcrunch.com/2019/02/15/3den-seed-funding/


Cash Flow Forecast Template (pdf)Download
Critical Items Log (pdf)Download
Long Lead Log (pdf)Download

JAMES PERSE

ABOUT THE PROJECT


  • Clothing Store build out within Saks Fifth Avenue.


  • HOME
  • O'LEARY GALLERY
  • REFERENCES
  • COMMUNICATIONS & PRESS
  • WORK BY CATEGORY
  • CORPORATE
  • HOSPITALITY
  • RETAIL
  • MEDIA
  • MEDICAL
  • INFRASTRUCTURE
  • ABOUT ME

Copyright © 2018 Conor O'Leary - All Rights Reserved.

Conor O'Leary (646) 683-2321 Conor@cpoleary.com